<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE root>
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" article-type="research-article" dtd-version="1.1d1" xml:lang="kk"><front><journal-meta><journal-id journal-id-type="publisher">Қазақстанның мұнай-газ саласының хабаршысы</journal-id><journal-title-group><journal-title>Қазақстанның мұнай-газ саласының хабаршысы</journal-title></journal-title-group><issn publication-format="print">2707-4226</issn><issn publication-format="electronic">2957-806X</issn><publisher><publisher-name>KMG Engineering</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="publisher-id">100351</article-id><article-id pub-id-type="doi">10.54859/kjogi100351</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group></article-categories><title-group><article-title>Economic efficiency due to increasing the turnaround period of operation of oil producing wells</article-title></title-group><contrib-group><contrib contrib-type="author"><name name-style="western"><surname>Khairetdinov</surname><given-names>Renat G.</given-names></name><email>r.khairetdinov@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Dabissov</surname><given-names>Gani E.</given-names></name><email>g.dabissov@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Ishangaliyev</surname><given-names>Serik V.</given-names></name><email>s.ishangaliyev@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff id="aff-1">KMG Engineering LLP</aff><pub-date date-type="epub" iso-8601-date="2022-05-16" publication-format="electronic"><day>16</day><month>05</month><year>2022</year></pub-date><volume>4</volume><issue>1</issue><fpage>114</fpage><lpage>126</lpage><history><pub-date date-type="received" iso-8601-date="2022-02-09"><day>09</day><month>02</month><year>2022</year></pub-date><pub-date date-type="accepted" iso-8601-date="2022-03-14"><day>14</day><month>03</month><year>2022</year></pub-date></history><permissions><copyright-statement>Copyright © 2022, Khairetdinov R.G., Dabissov G.E., Ishangaliyev S.V.</copyright-statement><copyright-year>2022</copyright-year></permissions><abstract>&lt;p&gt;The turnaround period of well operation is influenced by an extremely large number of factors covering the geological, physical, technical and technolog ical conditions of their operation. The higher the indicator of the turnaround period of well operation, the more efficiently the stack of wells works according to planned indicators, as well as low, first of all, operating costs for well maintenance, which accordingly affects the economic efficiency of well operation.&lt;/p&gt;&#13;
&lt;p&gt;In recent years, a number of oil companies have been paying close attention to the problem of increasing of the turnaround period of well operation. Measures being developed are aimed at:&lt;/p&gt;&#13;
&lt;p&gt;– reducing the aggressiveness of the extracted products;&lt;/p&gt;&#13;
&lt;p&gt;– improvement of the installation design of an electric centrifugal pump;&lt;/p&gt;&#13;
&lt;p&gt;– improving the design of downhole pumping equipment.&lt;/p&gt;</abstract><kwd-group xml:lang="en"><kwd>turnaround period of well operation</kwd><kwd>installation of an electric centrifugal pump</kwd><kwd>underground well repair</kwd><kwd>well overhaul</kwd><kwd>failure times</kwd><kwd>deep pumping equipment</kwd><kwd>control of complications</kwd><kwd>pumping and compressor pipes</kwd><kwd>asphalt-resin-paraffin deposits</kwd><kwd>cash flow</kwd></kwd-group><kwd-group xml:lang="kk"><kwd>ұңғымаларды пайдаланудың жөндеуаралық кезеңі</kwd><kwd>электр жетекті орталықтан тепкіш сорап қондырғысы</kwd><kwd>ұңғымаларды жер астында жөндеу</kwd><kwd>ұңғымаларды күрделі жөндеу</kwd><kwd>істен шығу жұмыстары</kwd><kwd>терең сорап жабдықтары</kwd><kwd>асқынулармен күрес</kwd><kwd>сорап-компрессорлық құбырлар</kwd><kwd>асфальт-шайырлы-парафинді шөгінділер</kwd><kwd>ақша ағыны</kwd></kwd-group><kwd-group xml:lang="ru"><kwd>межремонтный период эксплуатации скважин</kwd><kwd>установка электроприводного центробежного насоса</kwd><kwd>подземный ремонт скважин</kwd><kwd>капитальный ремонт скважин</kwd><kwd>наработки на отказ</kwd><kwd>глубинно-насосное оборудование</kwd><kwd>борьба с осложнениями</kwd><kwd>насосно-компрессорные трубы</kwd><kwd>асфальтосмолопарафиновые отложения</kwd><kwd>денежный поток</kwd></kwd-group></article-meta></front><body></body><back><ref-list><ref id="B1"><label>1.</label><mixed-citation>Расчет экономической эффективности от внедрения техники и технологий по увеличению МРП (сокращению количества ПРС) с сохранением фактического уровня добычи. Методические указания. – Нур-Султан, ТОО «Научно-исследовательский институт технологий добычи и бурения «КазМунайГаз», 2016. // Raschet ekonomicheskoj effektivnosti ot vnedreniya tehniki i tehnologii po uvelicheniyu MRP (sokrashheniyu kolichestva PRS) s sohraneniem fakticheskogo urovnya dobychi. Metodicheskie ukazaniya [Calculation of economic efficiency from the introduction of equipment and technologies to increase the TAT (reduce the number of WLO) while maintaining the actual level of production. Methodical instructions]. – Nur-Sultan, TOO «Nauchno-issledovatel'skij institut tehnologij dobychi i burenija «KazMunajGaz» ["Research Institute of Production and Drilling Technologies" KazMunayGas" LLP], 2016.</mixed-citation></ref></ref-list></back></article>
