<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE root>
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" article-type="research-article" dtd-version="1.1d1" xml:lang="kk"><front><journal-meta><journal-id journal-id-type="publisher">Қазақстанның мұнай-газ саласының хабаршысы</journal-id><journal-title-group><journal-title>Қазақстанның мұнай-газ саласының хабаршысы</journal-title></journal-title-group><issn publication-format="print">2707-4226</issn><issn publication-format="electronic">2957-806X</issn><publisher><publisher-name>KMG Engineering</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="publisher-id">95636</article-id><article-id pub-id-type="doi">10.54859/kjogi95636</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group></article-categories><title-group><article-title>The strategy for drilling new wells in the fields of «Ozenmunaigaz» JSC</article-title></title-group><contrib-group><contrib contrib-type="author"><name name-style="western"><surname>Khassanov</surname><given-names>B. K.</given-names></name><email>vestnik@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Sveshnikov</surname><given-names>A. V.</given-names></name><email>a.sveshnikov@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Ibrayev</surname><given-names>A. Ye.</given-names></name><email>a.ibrayev@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Baluanov</surname><given-names>B. A.</given-names></name><email>b.baluanov@niikmg.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Abdullaev</surname><given-names>U. Zh.</given-names></name><email>abdullaev_u@kaznipi.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Koptleuova</surname><given-names>Z. U.</given-names></name><email>koptleuova_z@kaznipi.kz</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Chernov</surname><given-names>S. O.</given-names></name><email>schernov@demac.com</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author"><name name-style="western"><surname>Machekhin</surname><given-names>D. S.</given-names></name><email>dmachekhin@demac.com</email><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff id="aff-1"></aff><pub-date date-type="epub" iso-8601-date="2020-09-15" publication-format="electronic"><day>15</day><month>09</month><year>2020</year></pub-date><volume>2</volume><issue>3</issue><fpage>80</fpage><lpage>87</lpage><history><pub-date date-type="received" iso-8601-date="2021-12-29"><day>29</day><month>12</month><year>2021</year></pub-date><pub-date date-type="accepted" iso-8601-date="2021-12-29"><day>29</day><month>12</month><year>2021</year></pub-date></history><permissions><copyright-statement>Copyright © 2020, Khassanov B.K., Sveshnikov A.V., Ibrayev A.Y., Baluanov B.A., Abdullaev U.Z., Koptleuova Z.U., Chernov S.O., Machekhin D.S.</copyright-statement><copyright-year>2020</copyright-year></permissions><abstract>&lt;p&gt;The article presents the results of applying the strategy for drilling new wells in the fields of Ozenmunaygas JSC, developed at the end of 2019, using the algorithm for planning and ranking the project fund taking into account the lower prospective productive horizon, drilling in the marginal zones of fields previously not covered by the development. This work is aimed at solving such a strategically important task as increasing the efficiency of drilling new wells in mature fields in the long term in the face of a decrease in the quality of reserves.&lt;/p&gt;</abstract><kwd-group xml:lang="en"><kwd>drilling strategy</kwd><kwd>drilling to the lower productive horizon</kwd><kwd>drilling to the marginal zones</kwd><kwd>localization of reserves</kwd><kwd>geological and technical measures efficiency</kwd><kwd>drilling plan</kwd></kwd-group><kwd-group xml:lang="ru"><kwd>стратегия бурения</kwd><kwd>бурение до нижнего продуктивного горизонта</kwd><kwd>бурение в краевые зоны</kwd><kwd>локализация запасов</kwd><kwd>эффективность ГТМ</kwd><kwd>ковер бурения</kwd></kwd-group></article-meta></front><body></body><back><ref-list><ref id="B1"><label>1.</label><mixed-citation>Tarek A. Reservoir engineering handbook. - Oxford, UK, Gulf Professional Publishing, 2010.</mixed-citation></ref><ref id="B2"><label>2.</label><mixed-citation>Лысенко В.Д. Разработка нефтяных месторождений. Теория и практика. - Москва, Недра, 1996, 367 стр.</mixed-citation></ref></ref-list></back></article>
